How To - Connect 24 V DC installation

Brewiks tanks have pre set 24 V DC wiring. Tanks are interconnected into each other and last tank is connected to separate electrical box. Complete wiring is...

How To - Add heating water

Brewiks 300 and 500 needs water for heating system. If system is empty then water needs to be added.

How To - Remove heating water

Brewiks 300 and 500 use water under pressure for heating. If unit is stored in freezing area then heating water needs to be removed. If heaters needs to be r...

How To - Add water in mash tun

On lowest point of pump is connection 11. This connection is used to fill clean water in mash tun and for cleaning of mash tun.

How To - Add malt

Adding malt in main unit.

How To - Sparge system

Sparging system heats up cold water in real time when hot water needed for sparging.

How To - Lauter tun lid

Lauter tun lid is made from multiple parts. First part is part with side reinforcements and then second parts are without side reinforcements.

How To - False bottom

False bottom is made from multiple parts. First part is part with side reinforcement and then second parts are without side reinforcement.

How To - Condensing lid

Condensing lid is used to condense steam during boiling. With cold water steam is condensed and removed from boiling kettle.

How To - Check heating pump

If heating doesn't work you need to check if heating pump is rotating.

How To - Set temperature probe

If measured temperature deviate to much then temperature probe is out of position. When probe is completely removed then you need to measure depth of probe p...

How To Power wire main unit

How to power wire main Brewiks unit.